Simple Tech — home
01 / 05·Naubise–Mugling corridor · 05:42

Birgunj to Kathmandu. Every kilometre.

Cross-border freight tracked from the customs stamp to the warehouse gate, with the paper trail every regulator on the route accepts.

02 / 05·Ring Road · Boudha → Sankhamul · 08:02

Every stop. Every parent. One screen.

Drivers stay on route, parents see the bus on the app, and the government report files itself at the end of the day.

03 / 05·Branch 042 · Maharajgunj · 22:14

Vault to vault. Nothing unaccounted for.

Every stop, every door, every minute of dwell, recorded the way a bank's compliance officer wants to read it.

04 / 05·Upper Tamakoshi access road · 16:40

Past the last tower, we still see the truck.

Built for the corridors where signal disappears. The device keeps recording, and the trip reappears intact when the link comes back.

05 / 05·STS·EV·R03 · battery lab · 14:30

Next, the battery.

EV fleets are coming to Nepal. We're building the cell-level telemetry the way we built the tracker, engineered in-house, in Kathmandu.

the regulators · receipts only

Built for Nepal's rulebook.

Every line below is a regulation we already meet, at the device, in the firmware, on the server. No claim we can't show on paper.

VCTS

VCTS-ready

Consignment tracking wired into DRI's Vehicle & Consignment Tracking System. 6,100+ firms already mandated to comply.

6,172 firms enrolled · NPR 50k/100k fineslive
NTA framework

Data resident in Nepal

Telematics, events, and audit logs stored on Nepal-resident infrastructure, aligned with NTA's IoT/M2M framework.

Nepal-resident · 5yr retentionlive
DoTM

DoTM-aligned reporting

Long-route public-transport reports in the format DoTM accepts. Pilot lineage with Nepal Government Data Center.

format DoTM acceptslive
M2M

NTC + Ncell M2M

NTA-licensed M2M SIM provisioning through both Nepali carrier pipelines. Authorized number ranges, signed contracts.

NTA-licensed pipelinelive

Terminal hardware certified to NTA approval; international cert lineage FCC / CE / RoHS where applicable. Server-side audit-retention default: 5 years.

origin · Kathmandu, NP
02 · who we work with

Where we show up.

Eight industries. Three lead: VCTS customs rail, BFSI hill-corridor collateral, heavy industrial. One platform, engineered and hosted in Nepal, wired into the compliance rails none of our competitors touch.

01 · top tier

Cross-border & customs (VCTS)

DRI’s VCTS mandates consignment entry + internet-based tracking linked to customs before a declared-goods truck moves. No foreign white-label platform integrates that rail. STS does.

Consignment events · ICD-to-ICD validation · DRI workflow integration
Talk to engineering
02 · top tier

Banking & BFSI

Auto-loan collateral on two-wheelers across Nepal’s hill districts. The edge: a coverage-safe immobilization pattern that re-enables the starter when there’s no cellular signal, so a borrower on a remote pass is never stranded.

Coverage-safe starter-interrupt · geofence audit · LOS integration
Talk to engineering
03 · top tier

Heavy industrial logistics

Cement, petroleum, and hydropower convoys on Birgunj-Mugling and Mugling-Pokhara. Fuel theft happens in the dead zones. STS queues telemetry through blackouts so the siphon event isn’t lost when the link drops.

Store-and-forward · fuel-curve analytics · sealed industrial hardware
Talk to engineering
04

Schools & public transport

DoTM’s April 2026 draft proposes mandatory GPS, CCTV with 3-month retention, panic buttons, and dual drivers on routes over 250 km. STS ships a compliance-ready bundle mapped to those exact provisions. Operators don’t scramble when the mandate lands.

Panic button · MDVR 3-month retention · parent app · DoTM-ready
Talk to engineering
05

Logistics & last-mile

Mixed fleets, last-mile riders, in-house corporate logistics. SLA enforcement, rider safety, asset accountability on one Nepal-hosted dashboard with NTA M2M SIMs already provisioned.

2W trackers · rider app · NTA M2M SIMs · ops dashboard
Talk to engineering
06

Government & utilities

CAAN, DHM, and infrastructure agencies already on our M2M pipeline. NTA-licensed, Nepal-hosted, procurement-document-ready. The due-diligence stack for public-sector procurement.

NTA M2M · auditable logs · procurement-ready · Nepal-hosted
Talk to engineering
07

Municipal & city fleets

Kathmandu and Pokhara metros managing waste collection, water tankers, and maintenance vehicles. Route adherence, collection verification, and a citizen-facing transparency layer. Locally hosted, procurement-clean.

Municipal SLA · route verification · citizen transparency · Nepal-hosted
Talk to engineering
03 · what we build

The full stack.

The device on the dash, the firmware inside it, and the dashboard your ops team opens every morning, all designed by us. Retail trackers live at Letstrack Nepal →

01 / 05P01

Vehicle GPS hardware

4-wheeler plug-and-play, hidden 2-wheeler theft-recovery, sealed industrial units. NTA-approved. Built for hill-corridor signal loss.

  • Fleet-grade plug-and-play (4W)
  • Hidden 2W theft-recovery
  • Sealed industrial enclosure
−10 °C to +60 °C · IP65 · FCC / CE / RoHS
02 / 05P02

Fleet platform

Cement tanker at 22:14 on the Birgunj corridor: 27 km of GSM-free road and the dashboard never blinks. Live positions, geofence breach, ignition cutoff, driver score, fuel curve, route playback. Same stack that runs Letstrack Nepal.

  • 24×7 dispatch for cement & petroleum
  • Parent app for school operators
  • BFSI portfolio dashboard
Multi-tenant · audit-retention 5 yr default · API + webhook
03 / 05P03

Dashcams & MDVR

Front + cabin, ADAS-ready hooks, event clips to cloud, on-device retention for the corridor where the LTE drops.

  • Cash-in-transit dual-driver audit
  • School bus cabin compliance
  • Long-haul fatigue events
Up to 4 channels · 1080p · LTE + offline buffer
04 / 05P04

Bluetooth & parking tags

Low-power, app-paired tags for the things that move with the fleet: luggage, shop-floor tools, scooter accessories.

  • Airport luggage
  • Shop-floor tools
  • Scooter accessory pairing
BLE 5.0 · 1-yr coin-cell · app-paired
05 / 05P05 · R&D

EV battery analytics

Cell-level telemetry, thermal envelope, cycle count, anomaly flags. Pilot track, engineered the way we built GPS.

  • Two-wheeler EV fleet pilots
  • Third-party battery diagnostics
  • Thermal anomaly flagging
21700 / pouch · ±0.2 °C · per-cell stream
04 · built here, not bought

We design our own gear.

Boards, firmware, platform: all ours. No white-label hardware with a sticker on it. When something breaks, we know exactly where to look.

P01

Hardware

Board-level design, RF and antenna tuning, sealed-enclosure thermals, in-vehicle harness work.

RF + thermals · in-house
P02

Firmware

OTA updates, power-budget engineering, queued telemetry for offline corridors, store-and-forward.

OTA · power-budget
P03

Platform

Nepal-hosted, NTA-aligned, multi-tenant, role-aware audit retention. Same stack that runs Letstrack Nepal.

Nepal-hosted · multi-tenant
P04

EV battery analytics

R&D pilot

R&D pilot. Cell-level telemetry, thermal envelope, cycle count. Two-wheeler EV fleets first.

21700 · ±0.2 °C

Three founders: hardware, platform, firmware. Based in Lalitpur. Named on-call rotation, 24x7.

About the team
05 · the receipts

Real fleets. Real numbers.

No logo wall, no rounded-up claims. Three working deployments. The names go up the day the contracts say we can.

case · 01·BFSI · auto-loan portfolio
An auto-loan customer crosses into Kavre at 02:18, half an hour past the geofence. The recovery officer's pager hits at 02:18:27. Before this, we'd find out at month-end when the EMI bounced.
Nepali commercial bank · top-5 by assets
disclosure pending contract
0+
active loans protected
0 s
breach-to-officer latency
case · 02·Cross-border freight · VCTS
Border-stamp scan at Birgunj, container leaves the gate, VCTS log writes itself. Twelve months in, zero NPR 50,000 first-violation fines and zero NPR 75,000 second-violation fines on this fleet.
Cross-border freight operator · Birgunj corridor
disclosure pending contract
0
vehicles VCTS-active
0
first + second violations · 12 mo
case · 03·Heavy industrial · NEA hydropower
Sixteen of the next twenty-seven kilometres have no GSM. Cell-LBS holds the fix, the device buffers events, the dashboard reconstructs the trip end-to-end when the link comes back.
NEA hydropower project corridor
disclosure at project milestone
0 km
without GSM coverage
0
missing telemetry events on reconciliation

Numbers are live. Customer names appear here once clearance lands.

All verticals
06 · talk to engineering

Talk to engineering.

Tell us who you are and what you're trying to move. We route to a named engineer within one business day.

What are you trying to move? (required)