Simple Tech — home
01 / 05·Naubise–Mugling corridor · 05:42

Birgunj to Kathmandu. Every kilometre.

Cross-border freight tracked from the customs stamp to the warehouse gate — with the paper trail every regulator on the route accepts.

02 / 05·Ring Road · Boudha → Sankhamul · 08:02

Every stop. Every parent. One screen.

Drivers stay on route, parents see the bus on the app, and the government report files itself at the end of the day.

03 / 05·Branch 042 · Maharajgunj · 22:14

Vault to vault. Nothing unaccounted for.

Every stop, every door, every minute of dwell — recorded the way a bank's compliance officer wants to read it.

04 / 05·Upper Tamakoshi access road · 16:40

Past the last tower, we still see the truck.

Built for the corridors where signal disappears — the device keeps recording, and the trip reappears intact when the link comes back.

05 / 05·STS·EV·R03 · battery lab · 14:30

Next, the battery.

EV fleets are coming to Nepal. We're building the cell-level telemetry the way we built the tracker — engineered in-house, in Kathmandu.

the regulators · receipts only

Built for Nepal's rulebook.

Every line below is a regulation we already meet — at the device, in the firmware, on the server. No claim we can't show on paper.

VCTS

VCTS-ready

Consignment tracking wired into DRI's Vehicle & Consignment Tracking System. 6,100+ firms already mandated to comply.

6,172 firms enrolled · NPR 50k/100k fineslive
NTA framework

Data resident in Nepal

Telematics, events, and audit logs stored on Nepal-resident infrastructure, aligned with NTA's IoT/M2M framework.

Nepal-resident · 5yr retentionlive
DoTM

DoTM-aligned reporting

Long-route public-transport reports in the format DoTM accepts. Pilot lineage with Nepal Government Data Center.

format DoTM acceptslive
M2M

NTC + Ncell M2M

NTA-licensed M2M SIM provisioning through both Nepali carrier pipelines. Authorized number ranges, signed contracts.

NTA-licensed pipelinelive

Terminal hardware certified to NTA approval; international cert lineage FCC / CE / RoHS where applicable. Server-side audit-retention default: 5 years.

origin · Kathmandu, NP
02 · who we work with

Where we show up.

Eight industries. Three lead — VCTS customs rail, BFSI hill-corridor collateral, heavy industrial. One platform, engineered and hosted in Nepal, wired into the compliance rails none of our competitors touch.

01 · top tier

Cross-border & customs (VCTS)

DRI’s VCTS mandates consignment entry + internet-based tracking linked to customs before a declared-goods truck moves. No foreign white-label platform integrates that rail. STS does.

Consignment events · ICD-to-ICD validation · DRI workflow integration
Talk to engineering
02 · top tier

Banking & BFSI

Auto-loan collateral on two-wheelers across Nepal’s hill districts. The edge: a coverage-safe immobilization pattern that re-enables the starter when there’s no cellular signal — so a borrower on a remote pass is never stranded.

Coverage-safe starter-interrupt · geofence audit · LOS integration
Talk to engineering
03 · top tier

Heavy industrial logistics

Cement, petroleum, and hydropower convoys on Birgunj–Mugling and Mugling–Pokhara. Fuel theft happens in the dead zones — STS queues telemetry through blackouts so the siphon event isn’t lost when the link drops.

Store-and-forward · fuel-curve analytics · sealed industrial hardware
Talk to engineering
04

Schools & public transport

DoTM’s April 2026 draft proposes mandatory GPS, CCTV with 3-month retention, panic buttons, and dual drivers on routes over 250 km. STS ships a compliance-ready bundle mapped to those exact provisions — operators don’t scramble when the mandate lands.

Panic button · MDVR 3-month retention · parent app · DoTM-ready
Talk to engineering
05

Logistics & last-mile

Mixed fleets, last-mile riders, in-house corporate logistics. SLA enforcement, rider safety, asset accountability — one Nepal-hosted dashboard with NTA M2M SIMs already provisioned.

2W trackers · rider app · NTA M2M SIMs · ops dashboard
Talk to engineering
06

Government & utilities

CAAN, DHM, and infrastructure agencies already on our M2M pipeline. NTA-licensed, Nepal-hosted, procurement-document-ready — the due-diligence stack for public-sector procurement.

NTA M2M · auditable logs · procurement-ready · Nepal-hosted
Talk to engineering
07

Municipal & city fleets

Kathmandu and Pokhara metros managing waste collection, water tankers, and maintenance vehicles. Route adherence, collection verification, and a citizen-facing transparency layer — locally hosted, procurement-clean.

Municipal SLA · route verification · citizen transparency · Nepal-hosted
Talk to engineering
08 · retail handoff

Personal vehicles & families

A tracker for your scooter, your kid, your pet? That’s retail — and retail lives at Letstrack Nepal.

Cars · bikes · pets · luggage · parking tags
Visit Letstrack Nepal
03 · what we build

The full stack.

The device on the dash, the firmware inside it, and the dashboard your ops team opens every morning — all designed by us. Retail trackers live at Letstrack Nepal →

01 / 05P01

Vehicle GPS hardware

4-wheeler plug-and-play, hidden 2-wheeler theft-recovery, sealed industrial units. NTA-approved. Built for hill-corridor signal loss.

  • Fleet-grade plug-and-play (4W)
  • Hidden 2W theft-recovery
  • Sealed industrial enclosure
−10 °C to +60 °C · IP65 · FCC / CE / RoHS
02 / 05P02

Fleet platform

Cement tanker at 22:14 on the Birgunj corridor: 27 km of GSM-free road and the dashboard never blinks. Live positions, geofence breach, ignition cutoff, driver score, fuel curve, route playback. Same stack that runs Letstrack Nepal.

  • 24×7 dispatch for cement & petroleum
  • Parent app for school operators
  • BFSI portfolio dashboard
Multi-tenant · audit-retention 5 yr default · API + webhook
03 / 05P03

Dashcams & MDVR

Front + cabin, ADAS-ready hooks, event clips to cloud, on-device retention for the corridor where the LTE drops.

  • Cash-in-transit dual-driver audit
  • School bus cabin compliance
  • Long-haul fatigue events
Up to 4 channels · 1080p · LTE + offline buffer
04 / 05P04

Bluetooth & parking tags

Low-power, app-paired tags for the things that move with the fleet — luggage, shop-floor tools, scooter accessories.

  • Airport luggage
  • Shop-floor tools
  • Scooter accessory pairing
BLE 5.0 · 1-yr coin-cell · app-paired
05 / 05P05 · R&D

EV battery analytics

Cell-level telemetry, thermal envelope, cycle count, anomaly flags. Pilot track — engineered the way we built GPS.

  • Two-wheeler EV fleet pilots
  • Third-party battery diagnostics
  • Thermal anomaly flagging
21700 / pouch · ±0.2 °C · per-cell stream
04 · built here, not bought

We design our own gear.

Boards, firmware, platform — all ours. No white-label hardware with a sticker on it. When something breaks, we know exactly where to look.

P01

Hardware

Board-level design, RF and antenna tuning, sealed-enclosure thermals, in-vehicle harness work.

RF + thermals · in-house
P02

Firmware

OTA updates, power-budget engineering, queued telemetry for offline corridors, store-and-forward.

OTA · power-budget
P03

Platform

Nepal-hosted, NTA-aligned, multi-tenant, role-aware audit retention. Same stack that runs Letstrack Nepal.

Nepal-hosted · multi-tenant
P04

EV battery analytics

R&D pilot

R&D pilot. Cell-level telemetry, thermal envelope, cycle count. Two-wheeler EV fleets first.

21700 · ±0.2 °C

Three founders — hardware, platform, firmware. Based in Lalitpur. Named on-call rotation, 24×7.

About the team
05 · the receipts

Real fleets. Real numbers.

No logo wall, no rounded-up claims. Three working deployments — and the names go up the day the contracts say we can.

case · 01·BFSI · auto-loan portfolio
An auto-loan customer crosses into Kavre at 02:18, half an hour past the geofence. The recovery officer's pager hits at 02:18:27. Before this, we'd find out at month-end when the EMI bounced.
Nepali commercial bank · top-5 by assets
disclosure pending contract
0+
active loans protected
0 s
breach-to-officer latency
case · 02·Cross-border freight · VCTS
Border-stamp scan at Birgunj, container leaves the gate, VCTS log writes itself. Twelve months in, zero NPR 50,000 first-violation fines and zero NPR 75,000 second-violation fines on this fleet.
Cross-border freight operator · Birgunj corridor
disclosure pending contract
0
vehicles VCTS-active
0
first + second violations · 12 mo
case · 03·Heavy industrial · NEA hydropower
Sixteen of the next twenty-seven kilometres have no GSM. Cell-LBS holds the fix, the device buffers events, the dashboard reconstructs the trip end-to-end when the link comes back.
NEA hydropower project corridor
disclosure at project milestone
0 km
without GSM coverage
0
missing telemetry events on reconciliation

Numbers are live. Customer names appear here once clearance lands.

All verticals
06 · talk to engineering

Talk to engineering.

Tell us who you are and what you're trying to move. We route to a named engineer within one business day.

What are you trying to move? (required)